Hexanode Vibration - Lead acid battery set up

⏩ Quick-step Hexanode Vibration set up - Lead Acid Battery


Steps

  1. Lift Solar Panel - Lift the solar panel and tighten screws via 45° bracket (for best solar, face panel North).
  2. Attach cross stand piece - Take standalone cross piece and screw L bracket to it
  3. Attach spikes - If the vibration device will be on soft ground (e.g. dirt), turnover vibration device and scew in spikes
  4. Connect battery, load and mount battery - Connect battery cable to solar controller and battery (ensure + goes to +, and - to -). Connect solar cable to solar controller (found behind solar panel). Connect load cable to solar controller. Connect load cable to the Vibration Device. Place battery lid on and secure with strap.
  5. Connect Hexanode Vibration -  Connect load cable (found under solar panel) to Vibration Device. The white marker face up is the best guide for inserting
  6. Check Hexanode Vibration is on - Observe the flashing LED light coming from the LED light from the centre of the SiteHive Logo: 🟢 Power on and making comms connection, 🔵 Power on and can't make comms connection.